search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Descargar folletos
Power by the Hour
preloader

julio 24, 2014

EGYPTAIR approves AXA Power equipment

At the beginning of July, EGYPTAIR approved 2x120KVA GPUs and one 120KVA load bank for their existing Hangar.

Eng. Samir, Facility Project Manager, and his Electro Mechanical Eng. Emad are also considering the new AXA 2400 technology for  the next development of EGYPTAIR MRO at CAIRO Airport.

Senior GSE specialist, Xavier Charrondière as well as Area Manager David Feuga (on the Photo left) did accompany the Egyptian guests during their visit in Denmark.

 

 

More news

Ago 27, 2026, posted in News

Celebrating Josie’s contributions at ITW GSE

After two productive months with our US production team, we recently said goodbye to our Process Engineering Intern, Josie P.   During her 4-months...

Ago 20, 2026, posted in News

Team Spirit on the Move at the DHL Relay

Once again, colleagues from across ITW GSE came together for the annual DHL Relay in Odense – an evening that combines exercise, friendly competition...

Ago 19, 2026, posted in News

Swivel Connector Solves Kinks at the Aircraft Connection Point

Efficient aircraft ground servicing depends on the safe and reliable transfer of fuel, air, and other utility services between ground support equipment (GSE) and...

Ago 05, 2026, posted in News

Mantén el ritmo de las operaciones de mantenimiento con conexiones de cable fiables

En la rampa, una mala conexión puede convertirse rápidamente en un problema operativo.   La alimentación eléctrica en tierra de las aeronaves debe ser...