search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
EcoGate
preloader

July 24, 2014

EGYPTAIR approves AXA Power equipment

At the beginning of July, EGYPTAIR approved 2x120KVA GPUs and one 120KVA load bank for their existing Hangar.

Eng. Samir, Facility Project Manager, and his Electro Mechanical Eng. Emad are also considering the new AXA 2400 technology for  the next development of EGYPTAIR MRO at CAIRO Airport.

Senior GSE specialist, Xavier Charrondière as well as Area Manager David Feuga (on the Photo left) did accompany the Egyptian guests during their visit in Denmark.

 

 

More news

May 13, 2026, posted in News

Open job position – Spare Parts Coordinator

Now is your chance to join our team! We are looking for an additional Spare Parts Coordinator to join our Support team located in...

May 07, 2026, posted in News

Modern air bases require more than infrastructure — they require integrated ground support

As military aviation evolves, so do the demands placed on air base infrastructure. New hangars and facilities are only part of the equation. Ensuring...

Apr 27, 2026, posted in News

Baden-Airpark GmbH Invests in Electric Ground Power Units to Reduce Airport Emissions

ITW GSE is proud to support Baden-Airpark GmbH (FKB Airport) in advancing its airport emission reduction strategy with the delivery of ten ITW GSE...

Apr 23, 2026, posted in News

Charging bottlenecks aren’t about fleet size — they’re about system design

Airports and ground handlers are accelerating the shift to electric GSE.But as fleets grow, a familiar challenge emerges:  Charging doesn’t scale the same way....