search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
preloader

mai 12, 2015

AXA 1400 does the job – in the sun or covered with snow

The AXA 1400

The AXA 1400

The AXA 1400 has experienced it’s first snow fall at Wideröes premises in Hammerfest. This is almost as far as one can come up North !

GSE Manager Mr. Frank Jonassen, based in Bodö, just sent us a brief report telling that their experiences with the GPU are very positive. The pilots have been very satisfied as the new AXA 1400 is more stable in suppling power than the old model (AXA 2200). A stable supply is important especially when it comes to the supply of propeller aircraft that are quite sensitive. So far, Frank tells that the unit has been used to supply a Dash-8.
When it comes to handling of the unit, Wideröe is also very satisfied with the smaller and lighter unit.

More news

Fév 24, 2026, posted in News

Se développer pour l’avenir

Célébrons le bon travail d’expansion des installations de production ! Cette semaine, nous avons honoré la fière tradition de marquer que la structure du...

Fév 24, 2026, posted in News

Puissance : le progrès à l’aéroport de Leeds Bradford

L’aéroport de Leeds Bradford (LBA) poursuit ses ambitions net-zéro en installant une nouvelle solution d’alimentation des portes d’embarquement comprenant 8 x ITW GSE 2400...

Fév 24, 2026, posted in News

Réflexion sur une Année remarquable

En cette fin d’année 2025, nous tenons à remercier chaleureusement nos partenaires, nos clients et nos homologues du monde entier. Tout au long de...

Fév 24, 2026, posted in News

Célébrer la saison – un pull à la fois

Chez ITW GSE, les fêtes de fin d’année ne se limitent pas aux réflexions de fin d’année : c’est aussi le moment de se...