search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Descargar folletos
Power by the Hour
preloader

mayo 12, 2015

AXA 1400 does the job – in the sun or covered with snow

The AXA 1400

The AXA 1400

The AXA 1400 has experienced it’s first snow fall at Wideröes premises in Hammerfest. This is almost as far as one can come up North !

GSE Manager Mr. Frank Jonassen, based in Bodö, just sent us a brief report telling that their experiences with the GPU are very positive. The pilots have been very satisfied as the new AXA 1400 is more stable in suppling power than the old model (AXA 2200). A stable supply is important especially when it comes to the supply of propeller aircraft that are quite sensitive. So far, Frank tells that the unit has been used to supply a Dash-8.
When it comes to handling of the unit, Wideröe is also very satisfied with the smaller and lighter unit.

More news

Abr 22, 2026, posted in News

Los 5 mejores procedimientos de mantenimiento anual para tu eGSE

Entendemos que, como tu eGSE contiene pocas piezas móviles y módulos de batería sellados, el mantenimiento es muy escaso. Sin embargo, hay 5 cosas...

Abr 22, 2026, posted in News

¡Ampliando nuestras instalaciones europeas!

Para satisfacer la creciente demanda mundial de equipos de apoyo en tierra sostenibles, estamos ampliando nuestra capacidad de producción europea en un 50% y...

Abr 22, 2026, posted in News

Una elección inteligente en acción: Las eGPUs ITW GSE 7400 en el aeropuerto de Nápoles

Este verano, tuvimos el placer de visitar la Autoridad Aeroportuaria de Nápoles para captar el rendimiento de nuestras GPU eléctricas de tierra en operaciones...

Abr 22, 2026, posted in News

¿Cómo puede el sector de la asistencia en tierra ser más sostenible?

La sostenibilidad se está convirtiendo en una prioridad clave en toda la aviación, y la asistencia en tierra desempeña un papel importante en la...