search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Brochüren Herunterladen
Power by the Hour
preloader

Mai 12, 2015

AXA 1400 does the job – in the sun or covered with snow

The AXA 1400

The AXA 1400

The AXA 1400 has experienced it’s first snow fall at Wideröes premises in Hammerfest. This is almost as far as one can come up North !

GSE Manager Mr. Frank Jonassen, based in Bodö, just sent us a brief report telling that their experiences with the GPU are very positive. The pilots have been very satisfied as the new AXA 1400 is more stable in suppling power than the old model (AXA 2200). A stable supply is important especially when it comes to the supply of propeller aircraft that are quite sensitive. So far, Frank tells that the unit has been used to supply a Dash-8.
When it comes to handling of the unit, Wideröe is also very satisfied with the smaller and lighter unit.

More news

Juni 24, 2026, posted in News

A day dedicated to safety, awareness, and teamwork

At ITW GSE, safety is a shared responsibility. Our philosophy is simple: all accidents can be prevented when we stay aware, speak up, and...

Juni 18, 2026, posted in News

ITW GSE Power Share Named Product Leader of the Year

Award-winning innovation for the electric ramp We are proud to announce that Power Share has been named Product Leader of the Year by Ground...

Juni 12, 2026, posted in News

Offene Stelle – Koordinator für Ersatzteile

Jetzt ist Ihre Chance, Teil unseres Teams zu werden! Wir suchen einen weiteren Ersatzteilkoordinator für unser Support-Team in Odense, Dänemark. Als Ersatzteilkoordinator arbeiten Sie...

Juni 12, 2026, posted in News

Hinter den Kulissen: Ein Einblick in den Weg der Ersatzteile

Die rechtzeitige Lieferung des richtigen Ersatzteils an den richtigen Ort ist ein wichtiger Bestandteil der Unterstützung des Flughafenbetriebs weltweit. Um sich ein besseres Bild...