search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Brochüren Herunterladen
Power by the Hour
preloader

August 31, 2018

Going Electric!

Airside International Magazine features the ITW GSE 7400 battery powered GPU in the autumn edition. The GSE industry is challenged to change existing design to meet the restrictions and emission limitation standards set forward by authorities. Therefore, there is a high demand for greener GSE solutions, like the new battery driven GPU and the ITW GSE 2400 solid-state GPUs.

Read the full article in Airside International here (page 36-37).

 

More news

Mai 13, 2026, posted in News

Open job position – Spare Parts Coordinator

Now is your chance to join our team! We are looking for an additional Spare Parts Coordinator to join our Support team located in...

Mai 12, 2026, posted in News

Baden-Airpark GmbH investiert in elektrische GPUs zur Reduzierung von Flughafenemissionen

ITW GSE ist stolz darauf, die Baden-Airpark GmbH (FKB Airport) mit der Lieferung von zehn ITW GSE 7400 elektrischen GPUs (electric ground power units)...

Mai 12, 2026, posted in News

Moderne Luftwaffenstützpunkte brauchen mehr als nur Infrastruktur – sie brauchen integrierte Bodenunterstützung

Mit der Entwicklung der militärischen Luftfahrt steigen auch die Anforderungen an die Infrastruktur der Flugplätze. Neue Hangars und Einrichtungen sind dabei nur ein Teil...

Apr. 22, 2026, posted in News

Die 5 wichtigsten jährlichen Wartungsmaßnahmen für Ihre eGSE

Da Ihr eGSE nur wenige bewegliche Teile und versiegelte Batteriemodule enthält, ist die Wartung sehr gering. Es gibt jedoch 5 Dinge, die Sie in...