search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Brochüren Herunterladen
Power by the Hour
preloader

November 23, 2016

Kuwait Airways install AXA 2400 GPUs

Photo showing Mr. Dsouza, Mr. Al Mazidi from Kuwait Airways to the right David Feuga, Claus Frydenlund Hansen and René Vang Sørensen (to the left)
Photo showing Mr. Dsouza, Mr. Al Mazidi from Kuwait Airways to the right
David Feuga, Claus Frydenlund Hansen and René Vang Sørensen (to the left)

Kuwait Airways has operated AXA GPUs since the 1990ies! Therefore, it was with great pleasure that we received Eng. Ali Al Mazidi; Senior Expert Construction & Maintenance and Rocky Dsouza; Facility Management Engineer for the Factory Acceptance Test of 8 pcs of the AXA 2400 90kVA GPUs earlier this week. The units will be used in Kuwait Airway’s maintenance hangar that will for instance accommodate the A350 in a near future.
The compatibility with the A350, the facts that the AXA 2400 GPUs are of the latest technology which also includes a unique voltage at output due to the Plug & Play system + that the 2400 units are compact and easy to maintain are some of the reasons why Kuwait Airways chose the AXA 2400 GPUs. During the visit, Mr. Al Mazidi and Mr. Dsouza also had the opportunity to get a thorough introduction to the AXA Power Coil and the AXA Power PCA that would be ideal products for the future development of Kuwait Int’l Airport.

More news

Mai 13, 2026, posted in News

Open job position – Spare Parts Coordinator

Now is your chance to join our team! We are looking for an additional Spare Parts Coordinator to join our Support team located in...

Mai 12, 2026, posted in News

Baden-Airpark GmbH investiert in elektrische GPUs zur Reduzierung von Flughafenemissionen

ITW GSE ist stolz darauf, die Baden-Airpark GmbH (FKB Airport) mit der Lieferung von zehn ITW GSE 7400 elektrischen GPUs (electric ground power units)...

Mai 12, 2026, posted in News

Moderne Luftwaffenstützpunkte brauchen mehr als nur Infrastruktur – sie brauchen integrierte Bodenunterstützung

Mit der Entwicklung der militärischen Luftfahrt steigen auch die Anforderungen an die Infrastruktur der Flugplätze. Neue Hangars und Einrichtungen sind dabei nur ein Teil...

Apr. 22, 2026, posted in News

Die 5 wichtigsten jährlichen Wartungsmaßnahmen für Ihre eGSE

Da Ihr eGSE nur wenige bewegliche Teile und versiegelte Batteriemodule enthält, ist die Wartung sehr gering. Es gibt jedoch 5 Dinge, die Sie in...