search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Brochüren Herunterladen
Power by the Hour
preloader

August 24, 2011

MAKS 2011 Airshow

Kåre M. Petersen, Area Manager for Russia reports from the
MAKS 2011 Airshow

Together with our Russian Distributor AEGE, AXA Power participated at the MAKS Airshow held in Moscow from 16.
to 21. August. AEGE/AXA Power was appointed offical supplier of 400 Hz equipment and as such, the AXA 400 Hz
ground power units did service the A380 as well as the Dreamliner / Boeing 787.

Thank you to all the visitors who dropped by our stand and made the exhibition a success
for the AEGE / AXA Power team.

AXA_400_Hz_Supplying_A380.png

 

Aege_Stand_Maks_aug_2011.pngAXA_400_Hz_Supplying_Dreamliner.png

More news

Juli 10, 2026, posted in News

ITW GSE Power Share zum „Produktführer des Jahres“ gekürt

Preisgekrönte Innovation für die elektrische Rampe Wir sind stolz darauf, bekannt geben zu dürfen, dass Power Share von „Ground Support Worldwide“ausgezeichnet wurde. Mit dieser...

Juli 10, 2026, posted in News

Ein Tag im Zeichen von Sicherheit, Sensibilisierung und Teamarbeit

Bei ITW GSE ist Sicherheit eine gemeinsame Verantwortung. Unsere Philosophie ist einfach: Alle Unfälle lassen sich vermeiden, wenn wir aufmerksam bleiben, uns zu Wort...

Juli 10, 2026, posted in News

Mehr Raum für Wachstum bei ITW GSE

ITW GSE wächst weiter – und mit ihm auch unsere Standorte. Nach der kürzlich erfolgten Erweiterung unseres Produktionsstandorts um 2.300 m² bauen wir nun...

Juni 12, 2026, posted in News

Offene Stelle – Koordinator für Ersatzteile

Jetzt ist Ihre Chance, Teil unseres Teams zu werden! Wir suchen einen weiteren Ersatzteilkoordinator für unser Support-Team in Odense, Dänemark. Als Ersatzteilkoordinator arbeiten Sie...