search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Descargar folletos
Power by the Hour
preloader

mayo 12, 2015

AXA 1400 does the job – in the sun or covered with snow

The AXA 1400

The AXA 1400

The AXA 1400 has experienced it’s first snow fall at Wideröes premises in Hammerfest. This is almost as far as one can come up North !

GSE Manager Mr. Frank Jonassen, based in Bodö, just sent us a brief report telling that their experiences with the GPU are very positive. The pilots have been very satisfied as the new AXA 1400 is more stable in suppling power than the old model (AXA 2200). A stable supply is important especially when it comes to the supply of propeller aircraft that are quite sensitive. So far, Frank tells that the unit has been used to supply a Dash-8.
When it comes to handling of the unit, Wideröe is also very satisfied with the smaller and lighter unit.

More news

May 13, 2026, posted in News

Open job position – Spare Parts Coordinator

Now is your chance to join our team! We are looking for an additional Spare Parts Coordinator to join our Support team located in...

May 12, 2026, posted in News

Baden-Airpark GmbH invierte en GPU eléctricas para reducir las emisiones de los aeropuertos

ITW GSE se enorgullece de apoyar a Baden-Airpark GmbH (Aeropuerto FKB) en el avance de su estrategia de reducción de emisiones aeroportuarias con la...

May 12, 2026, posted in News

Las bases aéreas modernas requieren algo más que infraestructura: necesitan un apoyo terrestre integrado

A medida que evoluciona la aviación militar, también lo hacen las exigencias impuestas a la infraestructura de las bases aéreas. Los nuevos hangares e...

Abr 22, 2026, posted in News

Los 5 mejores procedimientos de mantenimiento anual para tu eGSE

Entendemos que, como tu eGSE contiene pocas piezas móviles y módulos de batería sellados, el mantenimiento es muy escaso. Sin embargo, hay 5 cosas...