search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Power by the Hour
preloader

septiembre 24, 2015

Factory Acceptance Test of Houchin 4400 in the US

ITW GSE was very pleased to welcome Mr Roman Spilka, Ground Support Equipment Manager, from Czech Airlines Handling to our factory in Palmetto, Florida, USA to conduct a Factory Acceptance Test on their newly purchased Houchin 4400 GPU. Mr Spilka was very impressed with the size of our facility, how clean and efficient it was.

Following previous trials of the 4400 unit in Prague, Mr Spilka said: «we have had the opportunity to test the new Houchin 4400 Ground Power Unit for a few weeks. This unique Ground Power Unit features a compact design, full-size performance, which allows better mobility around aircraft, and it is easily handled. The new polyethylene canopy is corrosion free and much less heavy than the steel one, which we have on the Houchin C690 GPUs. The 4400 GPU is fuel efficient as it uses approximately 20% less of fuel than the current one. New control system gives us full information about the errors and its performance»
Photo Shows Roman Spilka and ITW GSE Area Sales Manager Jon Wells

Houchin 4400

More news

Nov 21, 2024, posted in News

Solving the electric infrastructure challenges

Watch Senior Sales Manager, Jose Manuel De Las Heras reveal our new charging solutions. Some airports lack eGSE charging possibilities due to grid limitations,...

Nov 19, 2024, posted in News

Is your eGPU ready for winter?

Here’s how to keep it performing at its best in colder months!  Perform Pre-Winter Maintenance: Start with a comprehensive check of the eGPU’s battery,...

Oct 10, 2024, posted in News

dnata adds 14 electric ground power units (GPUs) to Dubai fleet

US$ four million investment is part of air services provider’s ongoing efforts to move away from fossil-fuel engines New equipment to reduce fuel consumption...

Sep 26, 2024, posted in News

Power Back to the Grid!

‘Recycling’ energy from quality tests is now going full scale! Back in March, we announced that we had started ‘recycling’ the power used during...