search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Brochüren Herunterladen
Power by the Hour
preloader

Februar 16, 2010

New After Sales Engineer

 

Jesper Nielsen is back

Photo of Jesper NielsenTo strengthen the After Sales Department, we have employed Jesper Nielsen, B.Sc.E.E..

Jesper knows AXA Power quite well. He started his carreer here at AXA as an apprentice within the field of electrotechnics.  After he left AXA, Jesper did among other study to become an electrical engineer. During recent years, Jesper has worked with developing, testing, fault-finding and service of electronic equipment. Combined with his skills and knowledge of AXA Power’s products, this altogether means that we have a very qualified person to assist our customers.

Beside Jesper’s professional qualifications, he is also a capable member of the AXA Exercise team as he has gone through with the Copenhagen Marathon !
Last but not least – Jesper speaks English as well as German.

More news

Apr. 27, 2026, posted in News

Baden-Airpark GmbH Invests in Electric Ground Power Units to Reduce Airport Emissions

ITW GSE is proud to support Baden-Airpark GmbH (FKB Airport) in advancing its airport emission reduction strategy with the delivery of ten ITW GSE...

Apr. 22, 2026, posted in News

Die 5 wichtigsten jährlichen Wartungsmaßnahmen für Ihre eGSE

Da Ihr eGSE nur wenige bewegliche Teile und versiegelte Batteriemodule enthält, ist die Wartung sehr gering. Es gibt jedoch 5 Dinge, die Sie in...

Apr. 22, 2026, posted in News

Eine intelligente Wahl in Aktion: Die ITW GSE 7400 eGPUs am Flughafen von Neapel

In diesem Sommer hatten wir das Vergnügen, die Flughafenbehörde von Neapel zu besuchen, um zu sehen, wie unsere elektrischen GPUs im realen Betrieb funktionieren....

Apr. 22, 2026, posted in News

Wir erweitern unsere europäischen Einrichtungen!

Um die weltweit wachsende Nachfrage nach nachhaltigen Bodengeräten zu befriedigen, erweitern wir unsere Produktionskapazität in Europa um 50% und bauen 3.000 Quadratmeter neue Lagerfläche...