DCNS France
End of January, we received Mr Vincent Kerlo and Mr. Erwan Baudet from DCNS France Lorient as well as Mr. Jérôme Le Bellec and Mr. Eric Henrio from main contractor Spie, Ouest Centre for a Factory Acceptance Test of a Ground Power Unit.
The tested 400 Hz GPU with 28 VDC option included, will go on the corvette GOWIND which is under production at the French Naval Shipyard in Lorient in the Western part of France.
The photo shows the visitors along with ITW GSE Service Engineer, Mr. Alain Gargou and ITW GSE Area Manager Mr. Bernard Kosmider at end of the successful testing.