search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Brochüren Herunterladen
Power by the Hour
preloader

Dezember 15, 2015

Annual Holidays December 2015

ITW GSE ApS AXA Power is closed from 24-12-15 through 03-01-16 included due to annual holidays December 2015.

We do thank you all for a fruitful collaboration throughout 2015 and look forward to many new opportunities to extend our collaboration during 2016.

Mails received in the above periode of time and which require attention, will be answered as soon as possible after 04-01-2016.
Thank you for your understanding.

 

More news

Aug. 20, 2026, posted in News

Team Spirit on the Move at the DHL Relay

Once again, colleagues from across ITW GSE came together for the annual DHL Relay in Odense – an evening that combines exercise, friendly competition...

Aug. 19, 2026, posted in News

Swivel Connector Solves Kinks at the Aircraft Connection Point

Efficient aircraft ground servicing depends on the safe and reliable transfer of fuel, air, and other utility services between ground support equipment (GSE) and...

Aug. 05, 2026, posted in News

Sorgen Sie mit zuverlässigen Kabelverbindungen für reibungslose Abläufe

Auf der Rampe kann eine schlechte Verbindung schnell zu einem betrieblichen Problem werden.   Die Bodenstromversorgung für Flugzeuge muss zuverlässig, einfach zu handhaben und...

Aug. 05, 2026, posted in News

Unterstützung eines neuen Meilensteins in der Ultra-Langstrecken-Luftfahrt

Ein neuer Maßstab für Ultra-Langstreckenflüge nimmt Gestalt an, da sich Qantas darauf vorbereitet, im Rahmen des „Project Sunrise“ sein Flugzeug vom Typ Airbus A350-1000...