search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
EcoGate
preloader

December 15, 2015

Annual Holidays December 2015

ITW GSE ApS AXA Power is closed from 24-12-15 through 03-01-16 included due to annual holidays December 2015.

We do thank you all for a fruitful collaboration throughout 2015 and look forward to many new opportunities to extend our collaboration during 2016.

Mails received in the above periode of time and which require attention, will be answered as soon as possible after 04-01-2016.
Thank you for your understanding.

 

More news

Sep 30, 2026, posted in News

Looking for more GSE knowledge?

Ground support operations are changing. Electrification, charging infrastructure, aircraft power and cooling, and sustainability are just some of the topics shaping the decisions airports,...

Sep 24, 2026, posted in News

Open job position: Field Service Engineer

We are looking for an additional team member for our US Support team – are you the one? Your daily tasks will include a...

Sep 17, 2026, posted in News

Limited grid capacity? Put available gate power to work

As airports and ground handlers electrify more Ground Support Equipment, charging capacity can quickly become a challenge. ITW GSE Power Share is designed to...

Sep 08, 2026, posted in News

More than aircraft power: 7400 eGPU adds AUX outlets

The battery capacity in an eGPU can do more than supply 400 Hz aircraft power. With new optional AUX outlets, the ITW GSE 7400...