search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Brochüren Herunterladen
Power by the Hour
preloader

Januar 26, 2012

Are you prepared ?

 

– new legislation with regard to CO2 emissions has entered into force in Europe

 

As of Jan 1st 2012, the aviation industry joined Europe’s emissions trading scheme. All carriers using European airspace are thus being charged for carbon emissions. This means that everybody has an interest in reducing the carbon emissions to a very minimum.

Replacing the onboard aircraft APU with a fixed 400 Hz and pre-conditioned air installation, once the aircraft has docked at the gate. leads to considerable savings both with regard to CO2 as regarding costs in general. The CO2 emissions can be reduced by 85% whereas industry figures reveal that typical savings of about 100.000 EUR per gate per year for a typical single aisle gate. For information, the onboard APU of a narrow-body aircraft consumes approx. 150 l/fuel/hour.

 

Other useful links

http://www.bbc.co.uk/news/10086349

http://www.bbc.co.uk/news/business-16421117

http://europa.eu/rapid/pressReleasesAction.do?reference=MEMO/11/631&format=HTML&aged=0&language=EN&guiLanguage=en

 

 

 

More news

Mai 13, 2026, posted in News

Open job position – Spare Parts Coordinator

Now is your chance to join our team! We are looking for an additional Spare Parts Coordinator to join our Support team located in...

Mai 12, 2026, posted in News

Baden-Airpark GmbH investiert in elektrische GPUs zur Reduzierung von Flughafenemissionen

ITW GSE ist stolz darauf, die Baden-Airpark GmbH (FKB Airport) mit der Lieferung von zehn ITW GSE 7400 elektrischen GPUs (electric ground power units)...

Mai 12, 2026, posted in News

Moderne Luftwaffenstützpunkte brauchen mehr als nur Infrastruktur – sie brauchen integrierte Bodenunterstützung

Mit der Entwicklung der militärischen Luftfahrt steigen auch die Anforderungen an die Infrastruktur der Flugplätze. Neue Hangars und Einrichtungen sind dabei nur ein Teil...

Apr. 22, 2026, posted in News

Die 5 wichtigsten jährlichen Wartungsmaßnahmen für Ihre eGSE

Da Ihr eGSE nur wenige bewegliche Teile und versiegelte Batteriemodule enthält, ist die Wartung sehr gering. Es gibt jedoch 5 Dinge, die Sie in...