search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Brochüren Herunterladen
Power by the Hour
preloader

Juni 21, 2016

AXA 1400 Unit installed at Helideck

Our Russian distributor AEGE has commissioned the first AXA 1400 in use on a helideck. The unit is small and handy and it almost disappears on the helideck – but it is there – inside the red circle.

The unit was sold to company Wagenborg 102 in Kazakhstan.

More information on the AXA 1400 unit

Recently the ice classed barge ‘Wagenborg 102’ left the Caspian port of Bautino to support the dredging activities of Van Oord in the Prorva Channel. In order to comply with Van Oord and their clients standards a helideck was installed on ‘Wagenborg 102’.

More news

Nov. 13, 2026, posted in News

Verbesserung des Produktionsflusses bei ITW GSE in Odense

Ein frischer Blick auf die Produktionshalle ist nur ein Teil der laufenden Verbesserungen in unserer Produktionsstätte in Odense, Dänemark. Nach der Erweiterung unserer Produktionsstätten...

Nov. 13, 2026, posted in News

So bereiten Sie Ihre eGPU auf den Winter vor: Zwei wichtige Wartungstipps

Wenn die Temperaturen sinken, kann das Winterwetter zusätzliche Herausforderungen für den Bodenbetrieb am Flughafen mit sich bringen. Die Vorbereitung Ihrer elektrischen Ground Power Unit...

Okt. 30, 2026, posted in News

Eine Einheit, zwei Services: Wie die ITW GSE 7400 eGPU Flugzeugstrom und das Laden von eGSE unterstützt

Die Elektrifizierung wirft für Flughafenbetreiber und Ground Handler eine praktische Frage auf: Wo und wann wird elektrische Ausrüstung geladen – ohne zusätzliche Fahrten über...

Okt. 23, 2026, posted in News

Mehr als nur der Kaufpreis: Warum sich TCO bei einer eGPU-Flotte lohnt

Beim Vergleich einer konventionellen Diesel-GPU mit einer elektrischen GPU liegt der Fokus schnell auf dem Kaufpreis. Doch bei Geräten, die Tag für Tag im...