search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Brochüren Herunterladen
Power by the Hour
preloader

Oktober 16, 2019

High flexibility on a rainy day

ITW GSE today welcomed Facilities Maintenance Director, Mr. Mohammed Al Jabri and Mechanical Engineer, Mr. Afaq Ahmed from Presidential Flight in Abu Dhabi, UAE, for a factory acceptance test of additional ITW GSE 2400 GPUs for their facilities. Also present was ITW GSE distributor Mr. Elie Roukoz.

During a break in the test procedure, Commissioning Engineer Claus Frydenlund took the opportunity to introduce the new ITW GSE 7400 eGPU. Immediately, the gentlemen could find a lot of benefits of this ground power concept. No exhaust fumes, low noise level, no NOx nor CO2 emissions and high flexibility. The eGPU can be used inside a hangar and on the apron, it can be charged while supplying power, and it can also be used as a plane solid-state converter. To cover the power requirements for the fleet of the Presidential Flight that includes Code C and Code E aircraft among other, two 7400 GPUs would be ideal. So hopefully we can soon plan for another FAT?

Although the eGPU comes with high flexibility – it can not change rainy weather into sunshine… however, coming from a complete different climate, the gentlemen stated that the rain was actually simply perfect weather for them – at least for the day.

More news

Mai 13, 2026, posted in News

Open job position – Spare Parts Coordinator

Now is your chance to join our team! We are looking for an additional Spare Parts Coordinator to join our Support team located in...

Mai 12, 2026, posted in News

Baden-Airpark GmbH investiert in elektrische GPUs zur Reduzierung von Flughafenemissionen

ITW GSE ist stolz darauf, die Baden-Airpark GmbH (FKB Airport) mit der Lieferung von zehn ITW GSE 7400 elektrischen GPUs (electric ground power units)...

Mai 12, 2026, posted in News

Moderne Luftwaffenstützpunkte brauchen mehr als nur Infrastruktur – sie brauchen integrierte Bodenunterstützung

Mit der Entwicklung der militärischen Luftfahrt steigen auch die Anforderungen an die Infrastruktur der Flugplätze. Neue Hangars und Einrichtungen sind dabei nur ein Teil...

Apr. 22, 2026, posted in News

Die 5 wichtigsten jährlichen Wartungsmaßnahmen für Ihre eGSE

Da Ihr eGSE nur wenige bewegliche Teile und versiegelte Batteriemodule enthält, ist die Wartung sehr gering. Es gibt jedoch 5 Dinge, die Sie in...