search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Brochüren Herunterladen
Power by the Hour
preloader

April 12, 2019

Okinawa Japan chooses ITW GSE Pre-Conditoned Air Units

AGP has decided to test the ITW GSE 3400 PCA 210 at Okinawa, Japan, which has a very high temperature and humidity. The installation is scheduled for June 2019. Therefore, our Japanese distributor Tamagawa, Mr. Kohei Kimura and 2 representatives from AGP has witnessed a successful factory acceptance test at the Danish facility of the ITW GSE PCA. The Japanese visitors were very impressed to see the PCA Climatic Test Chamber where temperatures and humity can be set similar to Okinawa. Thank you for coming all the way from Japan! And thanks to our Product Managers for Ground Power Systems Kim K. Pedersen and Product Manager Pre-Conditioned Air Systems Jesper Nielsen as well as our Senior Lead Engineer Lars Schrøder.

More news

Aug. 20, 2026, posted in News

Team Spirit on the Move at the DHL Relay

Once again, colleagues from across ITW GSE came together for the annual DHL Relay in Odense – an evening that combines exercise, friendly competition...

Aug. 19, 2026, posted in News

Swivel Connector Solves Kinks at the Aircraft Connection Point

Efficient aircraft ground servicing depends on the safe and reliable transfer of fuel, air, and other utility services between ground support equipment (GSE) and...

Aug. 05, 2026, posted in News

Sorgen Sie mit zuverlässigen Kabelverbindungen für reibungslose Abläufe

Auf der Rampe kann eine schlechte Verbindung schnell zu einem betrieblichen Problem werden.   Die Bodenstromversorgung für Flugzeuge muss zuverlässig, einfach zu handhaben und...

Aug. 05, 2026, posted in News

Unterstützung eines neuen Meilensteins in der Ultra-Langstrecken-Luftfahrt

Ein neuer Maßstab für Ultra-Langstreckenflüge nimmt Gestalt an, da sich Qantas darauf vorbereitet, im Rahmen des „Project Sunrise“ sein Flugzeug vom Typ Airbus A350-1000...