search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
EcoGate
preloader

April 12, 2019

Okinawa Japan chooses ITW GSE Pre-Conditoned Air Units

AGP has decided to test the ITW GSE 3400 PCA 210 at Okinawa, Japan, which has a very high temperature and humidity. The installation is scheduled for June 2019. Therefore, our Japanese distributor Tamagawa, Mr. Kohei Kimura and 2 representatives from AGP has witnessed a successful factory acceptance test at the Danish facility of the ITW GSE PCA. The Japanese visitors were very impressed to see the PCA Climatic Test Chamber where temperatures and humity can be set similar to Okinawa. Thank you for coming all the way from Japan! And thanks to our Product Managers for Ground Power Systems Kim K. Pedersen and Product Manager Pre-Conditioned Air Systems Jesper Nielsen as well as our Senior Lead Engineer Lars Schrøder.

More news

May 22, 2026, posted in News

EU Airport Sustainability Goals Increase Demand for Flexible PCA Solutions

Airports across Europe are under increasing pressure to reduce emissions, improve energy efficiency, and accelerate the transition away from fossil-fuel-powered ground operations. New EU...

May 13, 2026, posted in News

Open job position – Spare Parts Coordinator

Now is your chance to join our team! We are looking for an additional Spare Parts Coordinator to join our Support team located in...

May 07, 2026, posted in News

Modern air bases require more than infrastructure — they require integrated ground support

As military aviation evolves, so do the demands placed on air base infrastructure. New hangars and facilities are only part of the equation. Ensuring...

Apr 27, 2026, posted in News

Baden-Airpark GmbH Invests in Electric Ground Power Units to Reduce Airport Emissions

ITW GSE is proud to support Baden-Airpark GmbH (FKB Airport) in advancing its airport emission reduction strategy with the delivery of ten ITW GSE...