search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Brochüren Herunterladen
Power by the Hour
preloader

November 25, 2013

And the first AXA 2400 goes to Russia

AXA 2400 Compact Power

As usual, our Russian Distributor, AEGE Ltd. takes pride in being the first to buy a new AXA Power product. Therefore, they have placed the first order for an AXA 2400 Compact Power unit. The unit is scheduled to leave the factory at the beginning of Januar 2014.

The AXA 2400 Compact Power was launched at the Inter Airport Exhibition in October of this year where the visitors did fancy the standard overload capability  as well as the Plug & Play feature that ensures the optimum voltage quality at the plug.

It’s all about connections

 

 

More news

Aug. 20, 2026, posted in News

Team Spirit on the Move at the DHL Relay

Once again, colleagues from across ITW GSE came together for the annual DHL Relay in Odense – an evening that combines exercise, friendly competition...

Aug. 19, 2026, posted in News

Swivel Connector Solves Kinks at the Aircraft Connection Point

Efficient aircraft ground servicing depends on the safe and reliable transfer of fuel, air, and other utility services between ground support equipment (GSE) and...

Aug. 05, 2026, posted in News

Sorgen Sie mit zuverlässigen Kabelverbindungen für reibungslose Abläufe

Auf der Rampe kann eine schlechte Verbindung schnell zu einem betrieblichen Problem werden.   Die Bodenstromversorgung für Flugzeuge muss zuverlässig, einfach zu handhaben und...

Aug. 05, 2026, posted in News

Unterstützung eines neuen Meilensteins in der Ultra-Langstrecken-Luftfahrt

Ein neuer Maßstab für Ultra-Langstreckenflüge nimmt Gestalt an, da sich Qantas darauf vorbereitet, im Rahmen des „Project Sunrise“ sein Flugzeug vom Typ Airbus A350-1000...