search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Power by the Hour
preloader

agosto 31, 2018

Going Electric!

Airside International Magazine features the ITW GSE 7400 battery powered GPU in the autumn edition. The GSE industry is challenged to change existing design to meet the restrictions and emission limitation standards set forward by authorities. Therefore, there is a high demand for greener GSE solutions, like the new battery driven GPU and the ITW GSE 2400 solid-state GPUs.

Read the full article in Airside International here (page 36-37).

 

More news

Nov 21, 2024, posted in News

Solving the electric infrastructure challenges

Watch Senior Sales Manager, Jose Manuel De Las Heras reveal our new charging solutions. Some airports lack eGSE charging possibilities due to grid limitations,...

Nov 19, 2024, posted in News

Is your eGPU ready for winter?

Here’s how to keep it performing at its best in colder months!  Perform Pre-Winter Maintenance: Start with a comprehensive check of the eGPU’s battery,...

Oct 10, 2024, posted in News

dnata adds 14 electric ground power units (GPUs) to Dubai fleet

US$ four million investment is part of air services provider’s ongoing efforts to move away from fossil-fuel engines New equipment to reduce fuel consumption...

Sep 26, 2024, posted in News

Power Back to the Grid!

‘Recycling’ energy from quality tests is now going full scale! Back in March, we announced that we had started ‘recycling’ the power used during...