search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Power by the Hour
preloader

noviembre 17, 2016

Dublin Airport Have Confidence in AXA

On November 15th, we were delighted to welcome 4 gentlemen from Dublin for the Factory Acceptance Test of 3 x GPUs destined for installation at Dublin Airport’s Terminal 3. The FAT was supervised by Sr. Project Manager, Brian Hou Nielsen and Area Manager Kevin J. Smith.

For the photos session, the gentlemen decided to gather around their new AXA 2400 mobile unit which will accompany 2 x AXA Power Coils for installation on Stand 307. During the small break, the airport personnel told that they felt very confident in AXA and the AXA products after their visit at the factory and the tests performed by Service & Commissioning Engineer Chris Ringvig.

Visit from Dublin Airport
Visit from Dublin Airport

Photos shows from left to right
Paul O’Boyle, Dublin
Kevin Smith, AXA Power
John Kelly, Dublin
Conor Clancy Specialist Technical Engineering Services
Brian Hou Nielsen, AXA Power
Damien Garry, Dublin

More news

Ago 29, 2025, posted in News

Hiring: Two open positions in our US Sales Team

We are hiring a Regional Sales Manager and an Area Sales Manager, both for our US Sales team!  Would you like to be part...

Ago 27, 2025, posted in News

EcoGate – an intelligent solution for greener airports

Airports worldwide are increasingly recognizing the importance of sustainability and energy efficiency. Meeting environmental targets, optimizing energy use, and enhancing passenger experiences are now...

Jul 29, 2025, posted in News

A Smart Choice in Action: The ITW GSE 7400 eGPUs at Naples Airport

This summer, we had the pleasure of visiting Naples Airport Authority to capture how our electric ground power units perform in real-life operations. The...

Jul 12, 2025, posted in News

Expanding our European facilities!

To meet the growing global demand for sustainable ground support equipment, we’re expanding our European production capacity by 50% and adding 3,000 square meters...