search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Power by the Hour
preloader

enero 31, 2017

Istanbul New Airport to stay cool and connected with AXA Power

AXA Power has a long and well proven experience supplying  GSE equipment to some of the largest airport projects in the world.
We are proud to announce having signed the contract to deliver both Ground Power – and Pre-Conditioned Air Units that will cool and power aircraft parked at the New Istanbul Airport.

The Factory Acceptance Test was successfully completed 31 January.

FAT participants: IGA, DHMI, ThyssenKrupp Airport Systems, Lojistik Servis Ticaret. Ltd.Sti and AXA Power

The Istanbul New Airport will be the busiest and biggest airport in the world, when fully operational in 2028. The airport will accommodate flights to 350 destinations and eventually, an annual capacity of 200 million passengers.
The construction of the new airport has four phases, and when the first phase ends in 2018, it will have the world’s largest terminal under one roof, with a gross floor area of nearly 11 million square feet and the ability to serve 90 million passengers a year. AXA Power will start delivering equipment already in 2017.
The total order consists of:

147 Power Coils
81 x PCA 3400 130 and 33 x PCA 3400 210.

Natually, all AXA Power Ground Power Units and Pre-Conditioned Air units  are equipped with the smart common ITW GSE icon-based user Interface;  as easy and intuitive to use as a smart phone or tablet.

Representatives participating in the Factory Acceptance Test:

DHMI:                         
Mr. Tayfun KUZEY, Mr. Selim ALAYBEYOĞLU, Mr. Adem CEYLAN & Mr. Murat ALBAYRAK

IGA:
Mr. Dominic LİDDELL, Mr. Güney ATALAY & Mr. Harun KARASAÇLI

ThyssenKrupp Airport Systems:
Mr. Diego Rivero Garcia  & Ms. Elena Mendez                                       

LST:
Mr. Hakan Fehmi GÖRK

AXA:
Mr. Poul Elvstrøm & Mr. Jan W. Sørensen

 

More news

Nov 21, 2024, posted in News

Solving the electric infrastructure challenges

Watch Senior Sales Manager, Jose Manuel De Las Heras reveal our new charging solutions. Some airports lack eGSE charging possibilities due to grid limitations,...

Nov 19, 2024, posted in News

Is your eGPU ready for winter?

Here’s how to keep it performing at its best in colder months!  Perform Pre-Winter Maintenance: Start with a comprehensive check of the eGPU’s battery,...

Oct 10, 2024, posted in News

dnata adds 14 electric ground power units (GPUs) to Dubai fleet

US$ four million investment is part of air services provider’s ongoing efforts to move away from fossil-fuel engines New equipment to reduce fuel consumption...

Sep 26, 2024, posted in News

Power Back to the Grid!

‘Recycling’ energy from quality tests is now going full scale! Back in March, we announced that we had started ‘recycling’ the power used during...