search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Descargar folletos
Power by the Hour
preloader

enero 07, 2021

New Year – New Connections!

Our high-quality aircraft cables and PCA hoses offer a variety of reliable connections including PCA connectors, swivel connectors, 400 Hz cable assemblies and much more.

The numerous options within our aircraft cables and PCA hoses is your chance to start 2021 with solid cables connections and efficient PCA hose.

Simply click and see some of the options here: Cables & Hoses brochure.

Remember that you can always find all the Cables and Hoses products on this website.

Create the best settings for leaving the runway by having the best equipment at the apron!

It’s all about connections!

 

More news

Abr 27, 2026, posted in News

Baden-Airpark GmbH Invests in Electric Ground Power Units to Reduce Airport Emissions

ITW GSE is proud to support Baden-Airpark GmbH (FKB Airport) in advancing its airport emission reduction strategy with the delivery of ten ITW GSE...

Abr 22, 2026, posted in News

Los 5 mejores procedimientos de mantenimiento anual para tu eGSE

Entendemos que, como tu eGSE contiene pocas piezas móviles y módulos de batería sellados, el mantenimiento es muy escaso. Sin embargo, hay 5 cosas...

Abr 22, 2026, posted in News

¡Ampliando nuestras instalaciones europeas!

Para satisfacer la creciente demanda mundial de equipos de apoyo en tierra sostenibles, estamos ampliando nuestra capacidad de producción europea en un 50% y...

Abr 22, 2026, posted in News

Una elección inteligente en acción: Las eGPUs ITW GSE 7400 en el aeropuerto de Nápoles

Este verano, tuvimos el placer de visitar la Autoridad Aeroportuaria de Nápoles para captar el rendimiento de nuestras GPU eléctricas de tierra en operaciones...