search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Brochüren Herunterladen
Power by the Hour
preloader

Juli 14, 2016

Factory Acceptance Test – Marrakech Ménara Airport

This week, a FAT was succesfully performed on 6 pcs of AXA Power Coils that are going to be installed in Marrakech Ménara Airport in Morocco.

Contrary to Morocco, the weather was rather cold on the day of the testing, but we managed to find just a few minutes with sun while the photo was taken.

IMG_4716

From left to right:
Mustapha Kanazy, ONDA (Office Nationale des Aéroports), Technical Director, Marrakech Airport
Adil Jajili, Innnovative Systems (ITW GSE Distributor)
Redouane Ait Moummad, ONDA
José Javier de la Rubia – COMSA (Contractor)
Bernard Kosmider, ITW GSE
Azzeddine Chemsi, ONDA, Casablanca

More news

Apr. 27, 2026, posted in News

Baden-Airpark GmbH Invests in Electric Ground Power Units to Reduce Airport Emissions

ITW GSE is proud to support Baden-Airpark GmbH (FKB Airport) in advancing its airport emission reduction strategy with the delivery of ten ITW GSE...

Apr. 22, 2026, posted in News

Die 5 wichtigsten jährlichen Wartungsmaßnahmen für Ihre eGSE

Da Ihr eGSE nur wenige bewegliche Teile und versiegelte Batteriemodule enthält, ist die Wartung sehr gering. Es gibt jedoch 5 Dinge, die Sie in...

Apr. 22, 2026, posted in News

Eine intelligente Wahl in Aktion: Die ITW GSE 7400 eGPUs am Flughafen von Neapel

In diesem Sommer hatten wir das Vergnügen, die Flughafenbehörde von Neapel zu besuchen, um zu sehen, wie unsere elektrischen GPUs im realen Betrieb funktionieren....

Apr. 22, 2026, posted in News

Wir erweitern unsere europäischen Einrichtungen!

Um die weltweit wachsende Nachfrage nach nachhaltigen Bodengeräten zu befriedigen, erweitern wir unsere Produktionskapazität in Europa um 50% und bauen 3.000 Quadratmeter neue Lagerfläche...