search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
EcoGate
preloader

July 14, 2016

Factory Acceptance Test – Marrakech Ménara Airport

This week, a FAT was succesfully performed on 6 pcs of AXA Power Coils that are going to be installed in Marrakech Ménara Airport in Morocco.

Contrary to Morocco, the weather was rather cold on the day of the testing, but we managed to find just a few minutes with sun while the photo was taken.

IMG_4716

From left to right:
Mustapha Kanazy, ONDA (Office Nationale des Aéroports), Technical Director, Marrakech Airport
Adil Jajili, Innnovative Systems (ITW GSE Distributor)
Redouane Ait Moummad, ONDA
José Javier de la Rubia – COMSA (Contractor)
Bernard Kosmider, ITW GSE
Azzeddine Chemsi, ONDA, Casablanca

More news

Jun 11, 2026, posted in News

Behind the Scenes: Understanding the Journey of Spare Parts

Getting the right spare part to the right location at the right time is an important part of supporting airport operations around the world....

May 22, 2026, posted in News

EU Airport Sustainability Goals Increase Demand for Flexible PCA Solutions

Airports across Europe are under increasing pressure to reduce emissions, improve energy efficiency, and accelerate the transition away from fossil-fuel-powered ground operations. New EU...

May 13, 2026, posted in News

Open job position – Spare Parts Coordinator

Now is your chance to join our team! We are looking for an additional Spare Parts Coordinator to join our Support team located in...

May 07, 2026, posted in News

Modern air bases require more than infrastructure — they require integrated ground support

As military aviation evolves, so do the demands placed on air base infrastructure. New hangars and facilities are only part of the equation. Ensuring...