search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Brochüren Herunterladen
Power by the Hour
preloader

September 23, 2016

AXA 2400 Installed at London Heathrow Airport

ITW GSE AXA Power’s UK Service Partner, JLC Aviation Services Ltd, have recently completed the upgrade of 3 x British Airways stands serving their B787-8 fleet of aircraft at their principal Maintenance Base at Heathrow Airport.

The photo shows 2 x AXA 2400 90 kVA GPUs  together with a cable crocodile which was retained from the former installation. An A380 aircraft supplies the background scenery!

A total of 6 x AXA 2400 90 kVA GPUs and 2 x AXA 90 kVA mobiles complete this project and compliment more than 60 AXA GPUs already in active service across the site

.

More news

Okt. 09, 2026, posted in News

Offene Stelle: Außendiensttechniker

Wir suchen ein weiteres Teammitglied für unser US-Support-Team – sind Sie die richtige Person dafür? Zu Ihren täglichen Aufgaben gehört ein breites Spektrum an...

Okt. 09, 2026, posted in News

Begrenzte Netzkapazität? Nutzen Sie die verfügbare Leistung an den Einspeisepunkten

Da Flughäfen und Bodenabfertigungsunternehmen immer mehr Ground Support Equipment elektrifizieren, kann die Ladekapazität schnell zu einer Herausforderung werden. ITW GSE Power Share wurde entwickelt,...

Okt. 09, 2026, posted in News

Möchten Sie mehr über GSE erfahren?

Die Bodenabfertigung befindet sich im Wandel. Elektrifizierung, Ladeinfrastruktur, Stromversorgung und Kühlung von Flugzeugen sowie Nachhaltigkeit sind nur einige der Themen, die die Entscheidungen von...

Okt. 09, 2026, posted in News

Gemeinsam mit dem Team wachsen: Bei ITW GSE nehmen die neuen Büroräume Gestalt an

Unser Team ist gewachsen – und nun wachsen auch unsere Räumlichkeiten mit uns. Im Laufe des Sommers gab es direkt vor den Fenstern von...