search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Brochüren Herunterladen
Power by the Hour
preloader

Dezember 04, 2017

Hands-on for Fighter Wing

A while ago, we were contacted by Fighter Wing Skrydstrup, a Military Base in the Western part of Denmark, who had an AXA 2300 that was out of service.
Instead of going to Skrydstrup to repair the unit, we turned the situation upside down. We agreed that a couple of technicians would come for product training at our premises in Odense and repair their own unit at the same time! And so they did. On top of the AXA 2300 product training, the Fighter Wing technicians  had a supplementary AXA 2400 training course.

The technicians  repair and maintain various kinds of equipment  used for the F-16 fighter aircraft, and as part of the job, they go to the areas where the Danish F-16 fleet is in operation.

Photo is showing Torben Schmidt, Nikolaj Flinker and Mikkel Blunck from Fighter Wing together with Service & Commissioning Engineer René Vang Sørensen (left) who preformed the training and supervised the repair of the faulty GPU.

More news

Juli 16, 2026, posted in News

Keep Turnarounds Moving with Reliable Cable Connections

On the ramp, a poor connection can quickly become an operational problem.   Aircraft ground power must be reliable, easy to handle, and ready...

Juli 10, 2026, posted in News

ITW GSE Power Share zum „Produktführer des Jahres“ gekürt

Preisgekrönte Innovation für die elektrische Rampe Wir sind stolz darauf, bekannt geben zu dürfen, dass Power Share von „Ground Support Worldwide“ausgezeichnet wurde. Mit dieser...

Juli 10, 2026, posted in News

Ein Tag im Zeichen von Sicherheit, Sensibilisierung und Teamarbeit

Bei ITW GSE ist Sicherheit eine gemeinsame Verantwortung. Unsere Philosophie ist einfach: Alle Unfälle lassen sich vermeiden, wenn wir aufmerksam bleiben, uns zu Wort...

Juli 10, 2026, posted in News

Mehr Raum für Wachstum bei ITW GSE

ITW GSE wächst weiter – und mit ihm auch unsere Standorte. Nach der kürzlich erfolgten Erweiterung unseres Produktionsstandorts um 2.300 m² bauen wir nun...