search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Brochüren Herunterladen
Power by the Hour
preloader

Dezember 08, 2021

Yet another well completed Factory Acceptance Test!

Soon, 32 x Power Coils and 14 x PCAs will be shipped of to Hamad International Airport, Qatar! 

Last week, we had the pleasure of hosting a Factory Acceptance Test (FAT) for the Power Coils and PCAs produced to Hamad Int. Airport in Qatar.

To witness and control the tests, Mr. Mustafa Ozgur Unal (Project Manager from TKAS) and Mr. Henrik Møller (Principal Surveyor from third party testing company DNV) joined forces and visited our facility.

In the photos you see them evaluating and verifying that the equipment is built and operating in accordance with the design specifications. The FAT was completed successfully, which you can tell from the big smiles on the group photo.

hamad international airport qatar power coils pcas

 

 

More news

März 25, 2026, posted in News

Top 5 Yearly Maintenance Procedures for your eGSE

We understand that because your eGSE contains little moving parts and sealed battery modules, maintenance is very little. However, there are 5 things you...

März 24, 2026, posted in News

How Airports Can Electrify Gates Without Expanding Grid Capacity

Electrify airport gates without major infrastructure upgrades. Learn how coordinated power management optimizes existing grid capacity. Optimizing infrastructure before investing in major upgrades Airport...

März 17, 2026, posted in News

Giving Battery Packaging a Second Life

At ITW GSE, reducing environmental impact is not only about the products we deliver. It is also about how we handle the materials that...

Feb. 24, 2026, posted in News

Expandieren für die Zukunft

Wir feiern die gute Arbeit bei der Erweiterung der Produktionsanlagen! Diese Woche haben wir die stolze Tradition gewürdigt, zu markieren, dass die Dachkonstruktion steht,...