search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Brochüren Herunterladen
Power by the Hour
preloader

November 21, 2024

Solving the electric infrastructure challenges

Watch Senior Sales Manager, Jose Manuel De Las Heras reveal our new charging solutions.

Some airports lack eGSE charging possibilities due to grid limitations, but most electric GPUs have excess electrical capacity at the input due to many aircraft not drawing a full load. The Power Share lets you use that excess power from the grid without having to upgrade the gate infrastrucutre as it distributes the power efficiently to your eGPU or other charging applications. Combining an ITW GSE 2400 GPU with a Power Share allows more 50/60Hz AC equipment to be charged even when the GPU is supplying 400Hz power to the aircraft.

power share and 7400 eGPU

The eGPUs now have the option of an AC Type two inlet that eases the charging in the cases where airports already have installed AC wall chargers incl. cables. Soon, a CCS2 DC inlet will also be an option to the 7400 eGPU.

 

Watch the video to hear Jose explain about the different solutions that we showcase at this year’s GSE Expo Europe in Lisbon

 

The latest addition to our charging solutions is the DC Charger, which lets you charge your high-voltage eGSE. It features two 60 kW (CCS2) outlets and can be connected to an ITW GSE 2400 GPU, which controls how much power the charger has available. This means you don’t need to upgrade your existing infrastructure – and it fits seamlessly into a complete eGPU family for aviation

Martin Walsted poses with ITW GSE’s new DC Charger
Martin Walsted, Key Account Manager, posing with the ITW GSE DC Charger at GSE Expo Europe

 

More news

Feb. 24, 2026, posted in News

Expandieren für die Zukunft

Wir feiern die gute Arbeit bei der Erweiterung der Produktionsanlagen! Diese Woche haben wir die stolze Tradition gewürdigt, zu markieren, dass die Dachkonstruktion steht,...

Feb. 24, 2026, posted in News

Leistung für den Fortschritt am Flughafen Leeds Bradford

Der Flughafen Leeds Bradford (LBA) treibt seine Netto-Null-Ambitionen durch die Installation einer neuen Gate-Energielösung mit 8 x ITW GSE 2400 Power Coils und 4...

Feb. 24, 2026, posted in News

Rückblick auf ein bemerkenswertes Jahr

Das Jahr 2025 neigt sich dem Ende zu und wir möchten uns bei unseren Partnern, Kunden und Branchenkollegen auf der ganzen Welt herzlich bedanken....

Feb. 24, 2026, posted in News

EU-Vorschriften treiben die Elektrifizierung von PCA und Toren voran

Was AFIR und TEN-T für die Einhaltung der Vorschriften an Flughäfen bedeuten Flughäfen in ganz Europa sehen sich strengeren Umweltauflagen gegenüber. Zwei wichtige EU-Rahmenwerke...