search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Brochüren Herunterladen
Power by the Hour
preloader

Januar 31, 2023

7400 eGPU Testimonial from BAE System

This is why the military is using electric ground power units

„The CO2, the NOx, the fumes, the noise and obviously the saving of fossil fuels that would normally be transported to station.“ – Max Waldron.

 

A few weeks ago, the BAE System and the UK RAF visited our DK production facilities to witness for themselves how we produce the ITW GSE 7400 eGPU 90 kVA, and how their great military green is going to look on the coming 40 units soon to be produced and delivered.

 

During their stay, we interviewed Max Waldron from BAE System and among other questions, we asked him how they came to think of using electric equipment, and you hear him respond in the testimonial video below.

You can see other testimonials for the 7400 eGPU here, and you can read about the 7400 unit itself here.

Watch the testimonial here:

 

More news

Jun 01, 2023, posted in News

11 Gates… 1 Terminal

Big project at JFK’s Terminal 4! The project included the installation of passenger boarding bridges with new 400 Hz/28 VDC Combination GPUs and 45-ton...

Mai 17, 2023, posted in News

ITW GSE 3500 PCA awarded the 2023 Ground Support Worldwide Product Leader of the Year

With features designed to reduce infrastructure costs and lower energy consumption, the ITW GSE 3500 PCA has been named the 2023 Ground Support Worldwide...

Apr 12, 2023, posted in News

A PM checklist for your cables!

Want to keep your cables operational and safe for as long as possible? Then you need a ‚Preventative Maintenance‘ checklist! Many airliners, airports and...

Mrz 08, 2023, posted in News

International Women’s Day

EMBRACE EQUITY When we embrace equity, we embrace diversity, and we embrace inclusion. Equality is the goal, and equity is the means to get...