search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Brochüren Herunterladen
Power by the Hour
preloader

Januar 27, 2010

New Frame Work Agreements

Conclusion of Frame Work Agreements
in Scandinavia

AXA POWER has won the tender for a frame work agreement with the Norwegian Defence. Over the next 3 years, we are going to deliver 35 – 50 ground power units to the Norwegian Defence. The units are in replacement of old obsolete units and for service of the Norwegian F16 fleet as well as the C-130 transport aircraft.

Further, we have concluded a frame work agreement with the Swedish Airport Authorities „Luftfartsverket“. For delivery of GPUs to Luftfartsverket’s 16 Airports all over Sweden. The first deliveries have already taken place to the airports in Bromma and Karlstad. Up for delivery are units for Stockholm.

Last but not least, we have signed an agreement with Copenhagen Airports for delivery of Ground Power Units for the Copenhagen Airports Bridge Project. This project includes 40 new Passenger Boarding Bridges which are currently being installed. Also the agreement is valid unit the end of 2012, explains Area Manager Martin Merstrand.

More news

Apr 21, 2022, posted in News

Celebrating the 100th unit of eGPU 90 kVA!

Hurray! Today, we celebrated the 100th produced unit of 90 kVA battery GPU, the ITW GSE 7400 eGPU. This unit is sold to TCR,...

Apr 05, 2022, posted in News

Proper Aircraft Cable Tension

The tension in the sockets of a GPU cable head are critical to the safety of the operators, equipment, and aircraft. Cables should be...

Mrz 01, 2022, posted in News

Proud to present our Model Factory

Our facility is a true “model factory” in every aspect. From the Inlining of all assembly lines where products flow through from start to...

Feb 10, 2022, posted in News

Changing the Abrasion Resistance End Cap

Watch how easy it is to change an ITW GSE Abrasion Resistant End Cap!    These 400 Hz replaceable caps are made of a...