search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Brochüren Herunterladen
Power by the Hour
preloader

November 21, 2024

Solving the electric infrastructure challenges

Watch Senior Sales Manager, Jose Manuel De Las Heras reveal our new charging solutions.

Some airports lack eGSE charging possibilities due to grid limitations, but most electric GPUs have excess electrical capacity at the input due to many aircraft not drawing a full load. The Power Share lets you use that excess power from the grid without having to upgrade the gate infrastrucutre as it distributes the power efficiently to your eGPU or other charging applications. Combining an ITW GSE 2400 GPU with a Power Share allows more 50/60Hz AC equipment to be charged even when the GPU is supplying 400Hz power to the aircraft.

power share and 7400 eGPU

The eGPUs now have the option of an AC Type two inlet that eases the charging in the cases where airports already have installed AC wall chargers incl. cables. Soon, a CCS2 DC inlet will also be an option to the 7400 eGPU.

 

Watch the video to hear Jose explain about the different solutions that we showcase at this year’s GSE Expo Europe in Lisbon

 

The latest addidion of charging solutions is the DC Charger which lets you charge your high voltage eGSE. It has two outlets  of 60 kW (CCS2) and can be connected to an ITW GSE 2400 GPU, which will control how much power the charger has available. This means that you do not have to upgrade your existing infrastructure.

Martin Walsted poses with ITW GSE’s new DC Charger
Martin Walsted, Key Account Manager, posing with the ITW GSE DC Charger at GSE Expo Europe

 

More news

Nov 19, 2024, posted in News

Is your eGPU ready for winter?

Here’s how to keep it performing at its best in colder months!  Perform Pre-Winter Maintenance: Start with a comprehensive check of the eGPU’s battery,...

Okt 10, 2024, posted in News

dnata adds 14 electric ground power units (GPUs) to Dubai fleet

US$ four million investment is part of air services provider’s ongoing efforts to move away from fossil-fuel engines New equipment to reduce fuel consumption...

Sep 26, 2024, posted in News

Power Back to the Grid!

‚Recycling‘ energy from quality tests is now going full scale! Back in March, we announced that we had started ‘recycling’ the power used during...

Aug 28, 2024, posted in News

New charging options to power eGSE!

Did you know that we have the power to cover your every need, no matter which type of ground power or pre-conditioned unit you...