All time high !
During September 2011, AXA Power shipped 150 Ground Power Units and PCA units – among others the major batch for the new Terminal S4 at Paris Charles de Gaulle Airport, France.
October 10, 2011
September Result
More news
Apr 23, 2026, posted in News
Charging bottlenecks aren’t about fleet size — they’re about system design
Airports and ground handlers are accelerating the shift to electric GSE.But as fleets grow, a familiar challenge emerges: Charging doesn’t scale the same way....
Apr 14, 2026, posted in News
Noida International Airport prepares for take-off with electrified gate operations
As Noida International Airport moves closer to inauguration, a key part of its operational setup is already in place: electrified gate infrastructure designed to...
Apr 07, 2026, posted in News
How can the ground handling industry become more sustainable?
Sustainability is becoming a key priority across aviation, and ground handling plays an important role in reducing emissions at airports. While much attention is...
Mar 25, 2026, posted in News
Top 5 Yearly Maintenance Procedures for your eGSE
We understand that because your eGSE contains little moving parts and sealed battery modules, maintenance is very little. However, there are 5 things you...