search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
EcoGate
preloader

January 31, 2017

Istanbul New Airport to stay cool and connected with AXA Power

AXA Power has a long and well proven experience supplying  GSE equipment to some of the largest airport projects in the world.
We are proud to announce having signed the contract to deliver both Ground Power – and Pre-Conditioned Air Units that will cool and power aircraft parked at the New Istanbul Airport.

The Factory Acceptance Test was successfully completed 31 January.

FAT participants: IGA, DHMI, ThyssenKrupp Airport Systems, Lojistik Servis Ticaret. Ltd.Sti and AXA Power

The Istanbul New Airport will be the busiest and biggest airport in the world, when fully operational in 2028. The airport will accommodate flights to 350 destinations and eventually, an annual capacity of 200 million passengers.
The construction of the new airport has four phases, and when the first phase ends in 2018, it will have the world’s largest terminal under one roof, with a gross floor area of nearly 11 million square feet and the ability to serve 90 million passengers a year. AXA Power will start delivering equipment already in 2017.
The total order consists of:

147 Power Coils
81 x PCA 3400 130 and 33 x PCA 3400 210.

Natually, all AXA Power Ground Power Units and Pre-Conditioned Air units  are equipped with the smart common ITW GSE icon-based user Interface;  as easy and intuitive to use as a smart phone or tablet.

Representatives participating in the Factory Acceptance Test:

DHMI:                         
Mr. Tayfun KUZEY, Mr. Selim ALAYBEYOĞLU, Mr. Adem CEYLAN & Mr. Murat ALBAYRAK

IGA:
Mr. Dominic LİDDELL, Mr. Güney ATALAY & Mr. Harun KARASAÇLI

ThyssenKrupp Airport Systems:
Mr. Diego Rivero Garcia  & Ms. Elena Mendez                                       

LST:
Mr. Hakan Fehmi GÖRK

AXA:
Mr. Poul Elvstrøm & Mr. Jan W. Sørensen

 

More news

Apr 27, 2026, posted in News

Baden-Airpark GmbH Invests in Electric Ground Power Units to Reduce Airport Emissions

ITW GSE is proud to support Baden-Airpark GmbH (FKB Airport) in advancing its airport emission reduction strategy with the delivery of ten ITW GSE...

Apr 23, 2026, posted in News

Charging bottlenecks aren’t about fleet size — they’re about system design

Airports and ground handlers are accelerating the shift to electric GSE.But as fleets grow, a familiar challenge emerges:  Charging doesn’t scale the same way....

Apr 14, 2026, posted in News

Noida International Airport prepares for take-off with electrified gate operations

As Noida International Airport moves closer to inauguration, a key part of its operational setup is already in place: electrified gate infrastructure designed to...

Apr 07, 2026, posted in News

How can the ground handling industry become more sustainable?

Sustainability is becoming a key priority across aviation, and ground handling plays an important role in reducing emissions at airports. While much attention is...