search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
EcoGate
preloader

May 03, 2018

Abu Dhabi Airport Midfield Project

Back in 2015,  ITW GSE delivered 136 pcs of the AXA Power 2400 solid-state converter  to the Midfield project in Abu Dhabi airport.
Beginning of April this year, the ITW GSE team in Dubai began the commissioning of  the units. As of today (3. May), approx. a third of the units is ready to be taken into service.

Thanks to ITW GSE Service and Commissioning Engineer Antonio Utulo for providing nice photo.

For information,  ITW GSE has over 600 units installed in the UAE!!

More news

Apr 23, 2026, posted in News

Charging bottlenecks aren’t about fleet size — they’re about system design

Airports and ground handlers are accelerating the shift to electric GSE.But as fleets grow, a familiar challenge emerges:  Charging doesn’t scale the same way....

Apr 14, 2026, posted in News

Noida International Airport prepares for take-off with electrified gate operations

As Noida International Airport moves closer to inauguration, a key part of its operational setup is already in place: electrified gate infrastructure designed to...

Apr 07, 2026, posted in News

How can the ground handling industry become more sustainable?

Sustainability is becoming a key priority across aviation, and ground handling plays an important role in reducing emissions at airports. While much attention is...

Mar 25, 2026, posted in News

Top 5 Yearly Maintenance Procedures for your eGSE

We understand that because your eGSE contains little moving parts and sealed battery modules, maintenance is very little. However, there are 5 things you...