search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
Power by the Hour
preloader

July 30, 2018

Auckland Airport completes major expansion

Congratulations to Auckland with the completion of the major expansion of the Pier B. An expansion that also includes refurbishment of Gate 17 and 18 with 10 pcs of ITW GSE 2400 units (Fixed Compact units and Power Coils) as well as 4 pcs of ITW GSE 3400 PCA 210/4.

During a meeting at Auckland Airport,  Xavier Charrondière, ITW GSE Sales Director, was asked by Tim Wilton, Engineering Services Manager at the airport, where he could see the PCA in service.  As there were no ITW GSE PCAs in New Zealand at that time, Xavier  contacted Melbourne Airport and organised a visit with short notice. Adam  Freebairn, our airport contact, unfortunately had another appointment. Therefore, he agreed that ITW GSE distributor, Peter Reidy, RATE Australia, showed his countryman  Tim Wilton the 3400 PCA. Peter confirmed the modular design and other benefits of the PCA – and Auckland airport decided for ITW GSE PCAs.

It’s all about connections!

ITW GSE 2400 Power Coils and 3400 PCA
ITW GSE 2400 Compact GPUs

 

 

More news

Nov 21, 2024, posted in News

Solving the electric infrastructure challenges

Watch Senior Sales Manager, Jose Manuel De Las Heras reveal our new charging solutions. Some airports lack eGSE charging possibilities due to grid limitations,...

Nov 19, 2024, posted in News

Is your eGPU ready for winter?

Here’s how to keep it performing at its best in colder months!  Perform Pre-Winter Maintenance: Start with a comprehensive check of the eGPU’s battery,...

Oct 10, 2024, posted in News

dnata adds 14 electric ground power units (GPUs) to Dubai fleet

US$ four million investment is part of air services provider’s ongoing efforts to move away from fossil-fuel engines New equipment to reduce fuel consumption...

Sep 26, 2024, posted in News

Power Back to the Grid!

‘Recycling’ energy from quality tests is now going full scale! Back in March, we announced that we had started ‘recycling’ the power used during...