search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
EcoGate
preloader

August 24, 2018

We Meet Every Challenge

Last Thursday evening, 10 ITW GSE Employees attended a 25 km relay race in Odense. The DHL race is the second largest exercise event at the island of Funen with more than 17.000 participants.

The ITW team ran as fast as they could, despite the lack of training during the summer holidays, and managed to cross the finishing line after 1.59.55! We thereby achieved a 31. and a 34. position, only 33 min. after the winner!

The two teams are ready to improve the performance to obtain an even better result next year !

We Meet Every Challenge

 

More news

Apr 23, 2026, posted in News

Charging bottlenecks aren’t about fleet size — they’re about system design

Airports and ground handlers are accelerating the shift to electric GSE.But as fleets grow, a familiar challenge emerges:  Charging doesn’t scale the same way....

Apr 14, 2026, posted in News

Noida International Airport prepares for take-off with electrified gate operations

As Noida International Airport moves closer to inauguration, a key part of its operational setup is already in place: electrified gate infrastructure designed to...

Apr 07, 2026, posted in News

How can the ground handling industry become more sustainable?

Sustainability is becoming a key priority across aviation, and ground handling plays an important role in reducing emissions at airports. While much attention is...

Mar 25, 2026, posted in News

Top 5 Yearly Maintenance Procedures for your eGSE

We understand that because your eGSE contains little moving parts and sealed battery modules, maintenance is very little. However, there are 5 things you...