search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
EcoGate
preloader

October 02, 2018

ITW GSE Finishes the HCA Marathon

Septemper 30th, more than 5000 people from all over the world have traveled to Odense to complete the 19th HCA Marathon.
The HCA Marathon offers a 1/2 Marathon at 21,097km and a Marathon at 42,195km.
Amoung the participants were 14 very fit ITW GSE employees who all have trained hard to complete the 1/2 Marathon.

During the run everybody was good at motivating and suppoting the new ITW GSE marathon runners.

All employees finished with great results!

 

Start no. Time Participant Company Pace
5859 1:36:19 Ronni Azulay ITW GSE 4:33 min/km
5857 1:37:26 Anders Ettrup ITW GSE 4:34 min/km
5861 1:39:29 Matthias Duelund Pedersen ITW GSE 4:42 min/km
5860 1:39:35 Alex Buus Nielsen ITW GSE 4:43 min/km
5858 1:42:33 Jesper Nielsen ITW GSE 4:51 min/km
5864 1:42:47 Jacob Blomberg ITW GSE 4:52 min/km
5867 1:42:49 Rene Eskelund ITW GSE 4:52 min/km
5855 1:42:59 Cecilie Frost Rasmussen ITW GSE 4:52 min/km
5854 1:43:00 Morten Vollerup ITW GSE 4:52 min/km
5853 1:47:41 Poul Elvstrøm ITW GSE 5:06 min/km
5866 1:54:56 Søren Clausen ITW GSE 5:26 min/km
5863 2:03:29 Jeyalingam Kathirgamathambi ITW GSE 5:47 min/km
5856 2:07:58 Marianne Rasmussen ITW GSE 6:03 min/km

Click here to read more about the HCA Marathon event.

More news

May 13, 2026, posted in News

Open job position – Spare Parts Coordinator

Now is your chance to join our team! We are looking for an additional Spare Parts Coordinator to join our Support team located in...

May 07, 2026, posted in News

Modern air bases require more than infrastructure — they require integrated ground support

As military aviation evolves, so do the demands placed on air base infrastructure. New hangars and facilities are only part of the equation. Ensuring...

Apr 27, 2026, posted in News

Baden-Airpark GmbH Invests in Electric Ground Power Units to Reduce Airport Emissions

ITW GSE is proud to support Baden-Airpark GmbH (FKB Airport) in advancing its airport emission reduction strategy with the delivery of ten ITW GSE...

Apr 23, 2026, posted in News

Charging bottlenecks aren’t about fleet size — they’re about system design

Airports and ground handlers are accelerating the shift to electric GSE.But as fleets grow, a familiar challenge emerges:  Charging doesn’t scale the same way....