search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
Power by the Hour
preloader

February 13, 2019

Approval of GPUs for Lisbon

Back in the start 90’ies, we sold a number of 400 Hz ground power units to ANA (Aeroportos e Navegaçào Aèrea) for  Lisbon airport. Those units have been operating till now, but nothing last forever and therefore, the airport has decided to replace the old ones by new ITW GSE unit.
It was with great pleasure that we welcomed Contractor Sotecnica, staff from Lisbon airport and ITW GSE’s Portuguese Distributor for a factory acceptance test of 9 new ITW GSE 2400 fixed 400 Hz units and one Power Coil earlier this week. During the visit, Product Manager Kim Petersen took the liberty of presenting the ground breaking 7400 eGPU to the visitors. As it appears from the photos the ambiance was good and cheerful.
Wishing Lisbon Airport lots of success with their new 400 Hz power units.

ITW GSE 2400, 400 Hz GPU, 2400 Power Coil, Factory Acceptance Test Lisbon airport

More news

Nov 21, 2024, posted in News

Solving the electric infrastructure challenges

Watch Senior Sales Manager, Jose Manuel De Las Heras reveal our new charging solutions. Some airports lack eGSE charging possibilities due to grid limitations,...

Nov 19, 2024, posted in News

Is your eGPU ready for winter?

Here’s how to keep it performing at its best in colder months!  Perform Pre-Winter Maintenance: Start with a comprehensive check of the eGPU’s battery,...

Oct 10, 2024, posted in News

dnata adds 14 electric ground power units (GPUs) to Dubai fleet

US$ four million investment is part of air services provider’s ongoing efforts to move away from fossil-fuel engines New equipment to reduce fuel consumption...

Sep 26, 2024, posted in News

Power Back to the Grid!

‘Recycling’ energy from quality tests is now going full scale! Back in March, we announced that we had started ‘recycling’ the power used during...