search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
EcoGate
preloader

June 12, 2019

Big shipment for huge Bangkok project

By 2020, the air traffic of Bangkok enters a new beginning, when the new Satellite terminal opens in Bangkok’s Suvarnabhumi Airport. The new terminal allows the airport to handle approx. 65 million passengers, and makes it one of the biggest international airports in Southeast Asia and a regional hub for aviation.

ITW GSE has the honor of supplying Ground Power Units and Pre-Conditioned Air units to this great project. During these days, we are shipping off 36 pieces of PCA units (210/4) and 72 pieces of Power Coils.

This great project is based the good cooperation between ITW GSE and Bangkok’s Suvarnabhumi Airport, as GPUs from ITW GSE are already installed at the current terminal, where the units have proven to be reliable and requiring low maintenance, hereby ensuring a maximum uptime.

We look forward to seeing the new units up and running in the new Satellite terminal.

 

 

 

More news

Sep 08, 2026, posted in News

More than aircraft power: 7400 eGPU adds AUX outlets

The battery capacity in an eGPU can do more than supply 400 Hz aircraft power. With new optional AUX outlets, the ITW GSE 7400...

Aug 31, 2026, posted in News

Celebrating 40 years with ITW GSE

Congratulations to Kim Koustrup Pedersen on four decades of dedication, technical expertise and commitment to ITW GSE ITW GSE just celebrated an impressive milestone...

Aug 27, 2026, posted in News

Celebrating Josie’s contributions at ITW GSE

After two productive months with our US production team, we recently said goodbye to our Process Engineering Intern, Josie P.   During her 4-months...

Aug 20, 2026, posted in News

Team Spirit on the Move at the DHL Relay

Once again, colleagues from across ITW GSE came together for the annual DHL Relay in Odense – an evening that combines exercise, friendly competition...