search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
EcoGate
preloader

February 03, 2016

Acceptance Test – DCNS France

DCNS France

End of January, we received Mr Vincent Kerlo and Mr. Erwan Baudet from  DCNS France Lorient as well as Mr. Jérôme Le Bellec and Mr. Eric Henrio from main contractor Spie, Ouest Centre for a Factory Acceptance Test of a Ground Power Unit.

The tested 400 Hz GPU with 28 VDC option included, will go on the corvette GOWIND which is under production at the French Naval Shipyard in Lorient in the Western part of France.

The photo shows the visitors along with ITW GSE Service Engineer, Mr. Alain Gargou and ITW GSE Area Manager Mr. Bernard Kosmider at end of the successful testing.

More news

Nov 18, 2026, posted in News

How to Prepare Your eGPU for Winter: Two Essential Maintenance Tips

As temperatures drop, winter weather can bring additional challenges to airport ground operations. Preparing your electric Ground Power Unit (eGPU) for colder conditions is...

Nov 09, 2026, posted in News

Improving production flow at ITW GSE in Odense

A fresh look on the production floor is just one part of the ongoing improvements at our production facility in Odense, Denmark. Following last...

Oct 28, 2026, posted in News

One unit, two services: How the ITW GSE 7400 eGPU supports aircraft power and eGSE charging

Electrification brings a practical question for airport operators and ground handlers: Where and when will electric equipment be charged – without extra trips across...

Oct 21, 2026, posted in News

Looking beyond the purchase price: the TCO case for an eGPU fleet

When comparing a conventional diesel Ground Power Unit with an electric GPU, it is easy to focus on the purchase price. But for equipment...