search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
EcoGate
preloader

October 08, 2015

OY-BPB, 71 years and still flying now sponsored by AXA Power


OY-BPB is the last remaining DC-3 air worthy aircraft of its kind in Denmark. It has a long and glorious track record. Since leaving the Douglas factory in Long Beach, California as no. 3406 out of approx. 10000 aircraft of the DC-3 type back in 1935, it has been flying all over the world. First with passengers, but later on for the Danish Armed Forces till its last official job on 30. July 1982.
Today, the aircraft is owned by the association For Flying Museum Aircraft, but it still takes off at special occassions with the help of the organization Danish Dakota Friends.
To help the Danish Dakota Friends in their efforts to maintain the aircraft, ITW GSE AXA Power has sponsored an AXA1400 28 VDC ground power unit that was delivered to the Dakota Friends on 3rd September 2015 by Managing Director Henrik Olsson, Senior Technician Chris Ringvig and Area Sales Manager Martin Walsted.
We wish OY-BPB many take-offs and happy landings in the years to come.
If the aircraft could speak, it would tell you …..

More news

May 13, 2026, posted in News

Open job position – Spare Parts Coordinator

Now is your chance to join our team! We are looking for an additional Spare Parts Coordinator to join our Support team located in...

May 07, 2026, posted in News

Modern air bases require more than infrastructure — they require integrated ground support

As military aviation evolves, so do the demands placed on air base infrastructure. New hangars and facilities are only part of the equation. Ensuring...

Apr 27, 2026, posted in News

Baden-Airpark GmbH Invests in Electric Ground Power Units to Reduce Airport Emissions

ITW GSE is proud to support Baden-Airpark GmbH (FKB Airport) in advancing its airport emission reduction strategy with the delivery of ten ITW GSE...

Apr 23, 2026, posted in News

Charging bottlenecks aren’t about fleet size — they’re about system design

Airports and ground handlers are accelerating the shift to electric GSE.But as fleets grow, a familiar challenge emerges:  Charging doesn’t scale the same way....