search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
EcoGate
preloader

January 21, 2015

AXA 2400 Delivery for new MRO in Muscat

MRO facility in Muscat

ITW GSE have received an order for the delivery of 24 pcs of AXA 2400 GPUs for a new MRO facility in Muscat, reports Sales Manager David Feuga from our Dubai office. The flexibility of the AXA 2400 as well as the unique Plug & Play voltage compensation system were the main reasons for the choice of AXA Power ground power units combined with the great support of our local distributor, National Trading & Projects.

ITW GSE AXA Power’s commitment to provide the right voltage at the aircraft plug (115V ±3V) is highly appreciated – and required by Middle East customers.

Besides the new delivery, ITW GSE AXA Power has already delivered 50 units to Seeb Int’l Airport (Muscat) and 16 units to Salalah Airport.

 

 

More news

Apr 23, 2026, posted in News

Charging bottlenecks aren’t about fleet size — they’re about system design

Airports and ground handlers are accelerating the shift to electric GSE.But as fleets grow, a familiar challenge emerges:  Charging doesn’t scale the same way....

Apr 14, 2026, posted in News

Noida International Airport prepares for take-off with electrified gate operations

As Noida International Airport moves closer to inauguration, a key part of its operational setup is already in place: electrified gate infrastructure designed to...

Apr 07, 2026, posted in News

How can the ground handling industry become more sustainable?

Sustainability is becoming a key priority across aviation, and ground handling plays an important role in reducing emissions at airports. While much attention is...

Mar 25, 2026, posted in News

Top 5 Yearly Maintenance Procedures for your eGSE

We understand that because your eGSE contains little moving parts and sealed battery modules, maintenance is very little. However, there are 5 things you...