search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
EcoGate
preloader

January 15, 2014

Information from Airbus on A380

In the latest edition of the  Airbus Aircraft Characteristics & Airport and Maintenance Planning manual, section 05-04-04 – it is stated that ” four 90 kVA GPU are necessary “. That is for normal turn around and for maintenance hangar operation

 

More news

May 13, 2026, posted in News

Open job position – Spare Parts Coordinator

Now is your chance to join our team! We are looking for an additional Spare Parts Coordinator to join our Support team located in...

May 07, 2026, posted in News

Modern air bases require more than infrastructure — they require integrated ground support

As military aviation evolves, so do the demands placed on air base infrastructure. New hangars and facilities are only part of the equation. Ensuring...

Apr 27, 2026, posted in News

Baden-Airpark GmbH Invests in Electric Ground Power Units to Reduce Airport Emissions

ITW GSE is proud to support Baden-Airpark GmbH (FKB Airport) in advancing its airport emission reduction strategy with the delivery of ten ITW GSE...

Apr 23, 2026, posted in News

Charging bottlenecks aren’t about fleet size — they’re about system design

Airports and ground handlers are accelerating the shift to electric GSE.But as fleets grow, a familiar challenge emerges:  Charging doesn’t scale the same way....