search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
EcoGate
preloader

May 26, 2010

AdP approves design of AXA Ground Power Unit for S4 Project

AXA Power is going to deliver 46 pcs of 90 kVA ground power units for the new Terminal S4 in Paris Charles de Gaulle Airport. The terminal will be taken into operation in Spring 2012. Today, M. Hayere and M. Gibert from AdP witnessed the test of the prototype and approved the design. Also present was M. Lefèvre from Shenzhen Tianda in Paris as well as AXA Power’s French Sales Manager Bernard Kosmider.

Test_ADP_May_10.png

 

 

More news

Nov 18, 2026, posted in News

How to Prepare Your eGPU for Winter: Two Essential Maintenance Tips

As temperatures drop, winter weather can bring additional challenges to airport ground operations. Preparing your electric Ground Power Unit (eGPU) for colder conditions is...

Nov 09, 2026, posted in News

Improving production flow at ITW GSE in Odense

A fresh look on the production floor is just one part of the ongoing improvements at our production facility in Odense, Denmark. Following last...

Oct 28, 2026, posted in News

One unit, two services: How the ITW GSE 7400 eGPU supports aircraft power and eGSE charging

Electrification brings a practical question for airport operators and ground handlers: Where and when will electric equipment be charged – without extra trips across...

Oct 21, 2026, posted in News

Looking beyond the purchase price: the TCO case for an eGPU fleet

When comparing a conventional diesel Ground Power Unit with an electric GPU, it is easy to focus on the purchase price. But for equipment...