search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
EcoGate
preloader

May 26, 2010

AdP approves design of AXA Ground Power Unit for S4 Project

AXA Power is going to deliver 46 pcs of 90 kVA ground power units for the new Terminal S4 in Paris Charles de Gaulle Airport. The terminal will be taken into operation in Spring 2012. Today, M. Hayere and M. Gibert from AdP witnessed the test of the prototype and approved the design. Also present was M. Lefèvre from Shenzhen Tianda in Paris as well as AXA Power’s French Sales Manager Bernard Kosmider.

Test_ADP_May_10.png

 

 

More news

Apr 14, 2026, posted in News

Noida International Airport prepares for take-off with electrified gate operations

As Noida International Airport moves closer to inauguration, a key part of its operational setup is already in place: electrified gate infrastructure designed to...

Apr 07, 2026, posted in News

How can the ground handling industry become more sustainable?

Sustainability is becoming a key priority across aviation, and ground handling plays an important role in reducing emissions at airports. While much attention is...

Mar 25, 2026, posted in News

Top 5 Yearly Maintenance Procedures for your eGSE

We understand that because your eGSE contains little moving parts and sealed battery modules, maintenance is very little. However, there are 5 things you...

Mar 24, 2026, posted in News

How Airports Can Electrify Gates Without Expanding Grid Capacity

Electrify airport gates without major infrastructure upgrades. Learn how coordinated power management optimizes existing grid capacity. Optimizing infrastructure before investing in major upgrades Airport...