fbpx search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
Power by the Hour
preloader

July 20, 2018

Thanks to Aéroport Marseille Provence

For choosing  ITW GSE units again. In 2013, Aéroport Marseille Provence  ordered  21 converters for their Terminal 1.  Those units have been performing very well and to the expectations of the airport. That is why, the airport has ordered our  ITW GSE 2400 units to supply aircraft with 400 Hz at the new terminal 2.
The factory acceptance test earlier this week was performed to the full satisfaction of the airport, the consultant and the installation company as well as. Alltogether, 8 units will go to Marseille for the terminal 2.

Visit from Marseille Provence Airport
The photo shows (left to right)

Bernard Kosmider, ITW GSE;  Claus Frydenlund, ITW GSE;  Stéphane Allasia, Aéroport Marseille Provence ; JK, ITW GSE; Daniel Guillen, IDtique Ingénierie; Thomas Guichard, D3E

More news

Aug 24, 2023, posted in News

The DHL Relay Race 2023!

Once again we took off for a run or powerwalk and enjoyed each others’ company.  One of our annual sporty and social team events...

Aug 15, 2023, posted in News

What is the TEN-T guidelines?

Well, they’re the Trans-European Transport Network by the European Parliament. Included in these guidelines are airport energy and operational efficiency. We find the TEN-T...

Jun 01, 2023, posted in News

11 Gates… 1 Terminal

Big project at JFK’s Terminal 4! The project included the installation of passenger boarding bridges with new 400 Hz/28 VDC Combination GPUs and 45-ton...

May 17, 2023, posted in News

ITW GSE 3500 PCA awarded the 2023 Ground Support Worldwide Product Leader of the Year

With features designed to reduce infrastructure costs and lower energy consumption, the ITW GSE 3500 PCA has been named the 2023 Ground Support Worldwide...