search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
EcoGate
preloader

December 15, 2015

Annual Holidays December 2015

ITW GSE Group UK is closed from 24-12-15 through 03-01-16 included due to annual holidays.

We do thank you all for a fruitful collaboration throughout 2015 and look forward to many new opportunities to extend our collaboration during 2016.

Mails received in the above periode of time and which require attention, will be answered as soon as possible after 04-01-2016.
Thank you for your understanding.

 

More news

May 13, 2026, posted in News

Open job position – Spare Parts Coordinator

Now is your chance to join our team! We are looking for an additional Spare Parts Coordinator to join our Support team located in...

May 07, 2026, posted in News

Modern air bases require more than infrastructure — they require integrated ground support

As military aviation evolves, so do the demands placed on air base infrastructure. New hangars and facilities are only part of the equation. Ensuring...

Apr 27, 2026, posted in News

Baden-Airpark GmbH Invests in Electric Ground Power Units to Reduce Airport Emissions

ITW GSE is proud to support Baden-Airpark GmbH (FKB Airport) in advancing its airport emission reduction strategy with the delivery of ten ITW GSE...

Apr 23, 2026, posted in News

Charging bottlenecks aren’t about fleet size — they’re about system design

Airports and ground handlers are accelerating the shift to electric GSE.But as fleets grow, a familiar challenge emerges:  Charging doesn’t scale the same way....