search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
EcoGate
preloader

March 15, 2016

Passenger Terminal has opened !

AXA Power stand

First Photo from AXA Power stand

Drop by to meet us and see

  • AXA 2400 Power Coil
  • AXA Power Compact
  • AXA Power PCA

Look forward to seeing you at stand 6024, Hall 10.2

AXA Power Staff

More news

Nov 18, 2026, posted in News

How to Prepare Your eGPU for Winter: Two Essential Maintenance Tips

As temperatures drop, winter weather can bring additional challenges to airport ground operations. Preparing your electric Ground Power Unit (eGPU) for colder conditions is...

Nov 09, 2026, posted in News

Improving production flow at ITW GSE in Odense

A fresh look on the production floor is just one part of the ongoing improvements at our production facility in Odense, Denmark. Following last...

Oct 28, 2026, posted in News

One unit, two services: How the ITW GSE 7400 eGPU supports aircraft power and eGSE charging

Electrification brings a practical question for airport operators and ground handlers: Where and when will electric equipment be charged – without extra trips across...

Oct 21, 2026, posted in News

Looking beyond the purchase price: the TCO case for an eGPU fleet

When comparing a conventional diesel Ground Power Unit with an electric GPU, it is easy to focus on the purchase price. But for equipment...