search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Download Brochures
EcoGate
preloader

June 29, 2011

AXA’s server is down on 1. July

 

Due to an up-date of our data systems, AXA Power’s server is not working on 01-07-2011. We therefore are unable to receive and to answer e-mails.

 

 

 

In case of urgent inquiries, kindly contact us by phone

AXA Power HQ: +45 63 18 60 00
AXA Power UK: + 44 – 01604 770239
AXA Power France: +33- 1 64 24 35 38
AXA Power Dubai: + 971 – 444 87 409

 

More news

Apr 27, 2026, posted in News

Baden-Airpark GmbH Invests in Electric Ground Power Units to Reduce Airport Emissions

ITW GSE is proud to support Baden-Airpark GmbH (FKB Airport) in advancing its airport emission reduction strategy with the delivery of ten ITW GSE...

Apr 23, 2026, posted in News

Charging bottlenecks aren’t about fleet size — they’re about system design

Airports and ground handlers are accelerating the shift to electric GSE.But as fleets grow, a familiar challenge emerges:  Charging doesn’t scale the same way....

Apr 14, 2026, posted in News

Noida International Airport prepares for take-off with electrified gate operations

As Noida International Airport moves closer to inauguration, a key part of its operational setup is already in place: electrified gate infrastructure designed to...

Apr 07, 2026, posted in News

How can the ground handling industry become more sustainable?

Sustainability is becoming a key priority across aviation, and ground handling plays an important role in reducing emissions at airports. While much attention is...